How do I set up Z+ units for parallel operation?

Posted by David on September 24, 2021
Posted in: Products

For higher power requirements, up to six Z+ programmable power supplies can be set in parallel for a total of 4,800W.

The host unit will be set to the number of units to be paralleled. The slave units can be set to advanced parallel or basic parallel. In advanced mode the host unit will display the total system current.  Please refer to the Z+ user manual for the connection drawings.